3 5 7 Ply Corrugated Box Carton Making Production Line

FOB Reference Price:Get Latest Price
$100,000.00 - $3,000,000.00 / Units | 1 Unit/Units (Min. Order)
Power:
700 KVA
Model Number:
WJ
Lead Time:
Quantity(Units) 1 - 1 >1
Est. Time(days) 150 Negotiable
Report Suspicious Activity
Overview
Quick Details
Warranty:
1 Year
Packaging Type:
Cartons, Film, Foil, Belt, Case
Packaging Material:
Plastic, Paper, Metal, Wood
Type:
Packaging Line
Applicable Industries:
Manufacturing Plant
Condition:
New
Application:
Apparel, Beverage, Chemical, Commodity, Food, Machinery & Hardware, Medical, Textiles
Automatic Grade:
Automatic
Driven Type:
Mechanical
Voltage:
380V
Place of Origin:
Guangdong, China
Brand Name:
West River
Dimension(L*W*H):
L40-120M
Weight:
200T
Certification:
CE ISO
After-sales Service Provided:
Online support, Field installation, commissioning and training, Field maintenance and repair service, Engineers available to service machinery overseas
Key Selling Points:
Energy saving
Running Speed:
100-300m/min
Width:
1200-2800mm
Supply Ability
Supply Ability:
30 Set/Sets per Year 0
Packaging & Delivery
Packaging Details
40GP container,bareness,15 sets of containers
Port
guangzhou or shenzhen
Lead Time :
Quantity(Units) 1 - 1 >1
Est. Time(days) 150 To be negotiated

3 5 7 Ply Corrugated Box Carton Making Production Line

 

 

 

 

Main Machines

Hygraulic Mill Roll Stand

Width 1200-2800mm. Maximum diameter of scroll 1500mm.

Auto Splicer

Buffer structure ensure splicing smoothly. Control by 6 sets of cylinders.

Pre-Heater

Control moisture of paper, and makes paper have even heating.

Single Facer

Inner/Outer vacuum fixed type. Ineer vacuum cassette type. fast change cassette type. fast change jumbo type.

Span Bridge

Bridge convey the corrugated single face cardboard by Guide device, conveying device, vacuum suction device

Glue Machine

Glue rollers are drived by transducer motors.

Double Facer

The temperature of each plate is same, ensure the cardboard be flat without deviation.

Slitter Scorer

Servo control system. Slitting knives and creasing wheels are control by servo motor. Applied to high-speed production line.

Cut-Off

Adopt advance servo synchronous drive, the cutting length from 500 to 9999mm

Glue Making & Cycle System

Automatic cycle of stirring glue and feed it to the storing tank.

Stacker

Ascend up and descend down by electromotive, output transverse automatically.

Steam Heating System

The pipe system which is connected with rotating parts are used metal flexible tube.

 

 

Layout for our customer

Our profession engineers are able to design the complete factory layout according to your requirements.

 

 

Finish products

Our equipment help you to produce high-quality cardboard and carton.

 

 

 

What do you know about our machines?

 

 

 

In the past couple of decades we have always insisted on high quality, our products are exported to more than 30 countries.

 

 

 

WestRiver Packaging Machinery was founded in 1954. The first semi-automatic single facer of China was born at our factory in 1978. It was the prelude of corrugated packaging industry.

 

 

 

Our engineers are available to service overseas 

 

We attend to the trade fairs all over the world

 

 

You are always welcome to visit our factory 

 

 

We adhere to the "quality firstreputation firstbusiness purposesand continuously forgeahead.

 

 

FAQs

1Q: Are you the manufacturer?
A: Yes, we are the professional manufacturer. 

2Q: Where are your factory located in ?
A: Our factory located in Zhaoqing city, Guangdong, China

3Q: Where is the nearest airport of factory ?
A: The nearest airport is Guangzhou Baiyun International airport. It take 1.5 hours from Guangzhou to Zhaoqing factory by car. We are glad to pick you up at the airport.

4Q: What is your business process?
A: Talk about requirements, confirm details, sign a sales contract, pay for deposit, arrange production, test machines, buyer pay for the balance payment, arrange shipment.

5Q: How to control machine quality ?
A: All material are environmental protection,non-pollution 
  We have professional technicists to supervising to production 
  Our professional department to examine about every production process

6Q:What can you do if the machine broken?
A: The warranty period is 1 year. If the broken parts can't repair, we can send the new parts to replace the broken parts for free, but you need to pay the freight. After warranty period, we can negotiate to the problems, and we supply the technical support for the whole life of the equipment.